Product Name
Oval Valve Handle — 304 Stainless Ball Valve, Vinyl-Coated Loop Grip, 1/4″–1″
Product Summary
A 304 stainless steel ball valve with an oval valve handle — a vinyl-coated loop grip that sits lower than a flat lever, so it fits tight pipe runs and is less likely to be knocked open by accident. Blue as standard; other coating colors on request.
Sizes 1/4″–1″. The oval handle is also available on its own for our ball valve series — tell us your valve model when ordering.
ISO 9001 · CE · Manufacturer since 1999 · Made in Taiwan
Product Description
A 304 stainless steel ball valve fitted with an oval valve handle — a vinyl-coated loop grip in place of the standard flat lever. The loop sits closer to the valve body than a lever, so the valve fits where a lever would clash with neighbouring pipes, and the low profile makes it less likely to be knocked open or shut by accident. Blue is the standard coating color; other colors are available on request.
Sizes 1/4″ to 1″, 90° quarter-turn. The oval handle is also available on its own for our ball valve series, so a rusted, bent, or missing lever can be replaced without changing the valve.
Ordering the Handle Separately
The valve ships with the oval handle fitted. If you only need the handle:
- It fits our own ball valve series — typically 1/4″ to 1″ sizes.
- It is made to match our valve stems, so it is not guaranteed to fit other brands’ valves.
- Tell us your valve model and the coating color you need when ordering; blue is standard.
Key Specifications
| Material | ASTM 304 stainless steel |
|---|---|
| Coating | Vinyl — blue as standard, other colors available |
| Shape | Oval loop (ring) |
| Fits | Our ball valve series, typically 1/4″ – 1″ |
| Operation | 90° quarter-turn |
| SKU | HO-304 |
Why a Loop Instead of a Lever?
- Low profile: the loop projects less than a flat lever, so the valve can be installed where a lever would hit adjacent pipework.
- Harder to trip by accident: with less sticking out, the handle is less likely to be moved by a passing person or object.
- Vinyl-coated 304 stainless: the ring under the coating is stainless steel; blue as standard, other colors on request so lines can be color-coded.
Where It Is Used
- Tight pipe runs and manifolds — installations where a standard lever would interfere with neighbouring lines or equipment.
- Lines that must not be operated by accident — small isolation valves in areas with foot traffic or nearby moving parts.
- Small-bore instrument and panel-mounted valves — 1/4″ to 1″ stainless valves on instrument panels and equipment skids.
Which Handle Do You Need?
| Handle | Pick it when |
|---|---|
| Oval handle (this page) | The valve sits in a tight pipe run where a lever would clash, or must not be knocked open by accident; also as a color-coded replacement. |
| Lockable handle | The valve must be padlocked for lockout/tagout. |
| Extended handle | The valve sits on insulated pipe and the grip has to clear the insulation. |
| Graduated handle | You need a graduated scale with a locking pin. |
| Butterfly handle | You prefer a compact stainless T-shaped grip. |
Frequently Asked Questions
Can I buy the oval handle on its own as a replacement?
Yes. The valve ships with the handle fitted, and the handle is also sold separately, so you can replace a rusted, bent, or missing lever on your YZNG TRONG ball valve without changing the valve. Just tell us your valve model when you order.
Which valves does it fit?
Our own ball valve series, typically 1/4″ to 1″ sizes. The handle is made to match our valve stems, so we do not guarantee fit on other brands’ valves — include your valve model when ordering.
What colors are available?
Blue is the standard coating color. Other colors are available on request, which lets you color-code different lines and systems.
Is the handle itself stainless steel?
Yes. Under the vinyl coating the ring is ASTM 304 stainless steel.
Why choose an oval loop over the standard flat lever?
The loop projects less than a lever, so the valve fits in tight pipe runs where a lever would clash with neighbouring lines, and it is less likely to be moved by accident. It suits small isolation valves in busy areas.
How do I get a price?
Send us the valve size, quantity, and coating color — and, if you only need the handle, the valve model it is for. We reply to every inquiry within 24 hours.
Sample Policy
We are happy to provide product samples for customers to evaluate quality or conduct testing. The process typically begins with a quotation based on the customer’s specifications.
If the pricing is acceptable, we can offer samples either free of charge or at a cost depending on the product type and availability.
Shipping fees are borne by the customer.
Order Process
After confirming the product requirements and other details with the customer, we will issue a Sales Confirmation for approval. Once confirmed, the customer is required to pay a 30% deposit to proceed with production.
When mass production is completed and the goods pass inspection, the customer must pay the remaining 70% balance before shipment is arranged.
Related Products
-
Ball Valve Accessories
Ball Valve Handle Extension — 304 Stainless Ball Valve, Handle Raised 50 mm
-
Ball Valve Accessories
Memory Stop Ball Valve — 304 Stainless, Graduated 0–90° Handle
-
Ball Valve Accessories
Locking Handle Ball Valve — 304 Stainless, Padlock Hole, Lockable Open or Closed
-
Ball Valve Accessories
Butterfly Handle Ball Valve — 304 Stainless T-Handle Grip
-
Ball Valve Accessories
Valve Actuator Mounting Kit — ISO 5211 Bracket & Stem Coupling, 304 Stainless
FAQ
A. How can I request a quote?
Please provide a detailed inquiry sheet including product specifications, materials, quantities, and any special requirements. We will offer a quotation based on your request.
B. What are your quotation terms?
Our quotations are typically based on FOB terms. However, we can also offer CFR, CIF, or other Incoterms upon request.
C. What is your Minimum Order Quantity (MOQ)?
MOQ depends on the product. We operate on a made-to-order basis, and trial orders are welcome. For smaller orders, freight is arranged and borne by the buyer.
D. What are your payment terms?
By T/T – 30% down payment upon order confirmation, and 70% balance before shipment.
E. What is your lead time?
Lead time depends on order quantity and specifications. We will confirm the exact schedule when you request a quote.
Want to know more?
If you’re interested in any of our products or services, simply fill out the form below. Our team will get in touch with you as soon as possible to provide the information you need.





