Nome del prodotto
Manual Vacuum Valve – 3-Piece Vacuum Isolation Ball Valve, KF NW16–NW50 & ISO-K ISO80, 316, Lever or ISO 5211 Pad (V-3A / V-3AM)
Riepilogo del prodotto
A manual vacuum valve in a three-piece 316 stainless ball design: full port, PTFE seats, KF clamp flanges NW16 / NW25 / NW40 / NW50 (1/2″–2″) or ISO-K ISO80 (2-1/2″). Two builds on one body — the V-3A with a stainless lever, and the V-3AM with an ISO 5211 pad that takes a pneumatic or electric actuator with no bracket. The body unbolts for cleaning without cutting the valve out of the line. For fore-line, roughing-line and pump isolation, not as a high-vacuum chamber gate.
ISO 9001 · CE · Manufacturer since 1999 · Made in Taiwan
Manual Vacuum Valve or Direct-Mount? Two Builds, One Body (V-3A / V-3AM)
This manual vacuum valve is a three-piece 316 stainless ball valve with KF (NW16–NW50) or ISO-K (ISO80) clamp flanges, built to isolate a section of vacuum line by hand. The same body comes in two builds: the V-3A with a stainless lever, and the V-3AM with an ISO 5211 mounting pad so a pneumatic or electric actuator can be bolted on later without a bracket. Pick by how the line will be operated — now and after the next upgrade.
| V-3A (manual) | V-3AM (direct-mount) | |
|---|---|---|
| Funzionamento | Quarter-turn stainless lever with locking plate | ISO 5211 pad for a pneumatic or electric actuator — lever included for manual use |
| Stem seal | PTFE packing | Viton O-ring plus PTFE packing |
| Ideale per | Hand-operated isolation points on pump lines and manifolds | Lines that are — or may later be — automated |
Specifiche tecniche principali
| Tipo | Manual vacuum valve — three-piece vacuum isolation ball valve, full port |
| Modelli | V-3A (manual lever) / V-3AM (ISO 5211 direct-mount pad, lever included) |
| Gamma di taglie | 1/2″ – 2-1/2″ |
| Raccordi terminali | KF clamp flange: NW16 (KF16) at 1/2″, NW25 (KF25) at 1″, NW40 (KF40) at 1-1/4″, NW50 (KF50) at 1-1/2″ and 2″. ISO-K flange: ISO80 at 2-1/2″. |
| Corpo, cappuccio e pallina | ASTM A351 CF8M (cast 316 stainless steel) as standard; CF8 (cast 304) made to order |
| Seat & gaskets | PTFE |
| Stelo | ASTM A276 SS316; V-3AM adds a Viton O-ring for a reinforced stem seal |
| Porto | Full port — unrestricted bore through the valve |
| Temperatura di esercizio | −20 °C to +180 °C (valve body, set by the PTFE seats) |
| Servizio | Vacuum and negative-pressure isolation — on/off duty, not for throttling |
| Montaggio dell'attuatore | V-3AM: ISO 5211 pad, direct mount, no bracket |
| Dimension sheets | See the PDF downloads above (V-3A KF / ISO-K, V-3AM NW) |
Isolation Valve Design: Why a Three-Piece Ball Valve
A ball valve is the plain answer for an isolation point on a fore-line, roughing line or manifold: a quarter turn opens or closes it, and in the open position the full-port bore leaves nothing in the gas path, so the valve does not choke the pumping speed of the line it sits in. That is the job this valve is built for — shutting a section in or out — not regulating flow.
The three-piece body is the service advantage. The two end caps stay clamped in the line while the centre section unbolts, so seats and ball can be inspected, cleaned or replaced without cutting the valve out or disturbing the flanges on either side. On a KF or ISO-K line that is an afternoon job with hand tools, not a rebuild.
Seats and gaskets are PTFE, the stem is SS316, and the V-3AM adds a Viton O-ring on the stem for a reinforced seal where an actuator will be cycling it. The body, cap and ball are cast 316 (CF8M) as standard, with 304 (CF8) available to order.
KF NW16–NW50 or ISO-K ISO80 Ends
KF (also written NW, QF or ISO-KF) is the small quick-clamp vacuum flange: a centering ring with an O-ring sits between two flanges and a clamp closed by hand holds them together, no bolts and no tools. This valve covers KF16, KF25, KF40 and KF50 — the sizes vacuum lines are built from — at 1/2″ to 2″.
ISO-K is the larger clamp-flange standard that takes over where KF ends. The 2-1/2″ size here uses ISO80, held with clamps and a centering ring. Match the valve to the flange already on your line; the same three-piece body and the same lever or ISO 5211 pad sit behind either end.
Applicazioni
Where a manual vacuum valve of this type is actually used, and why a ball valve is the right tool there:
- Foreline and roughing-line isolation: between the backing pump and the system, so the pump can be serviced or vented while the line upstream stays under vacuum.
- Sample-entry locks: a low-cost load lock: open to pump down, close to vent and change the sample; the full bore keeps pump-down fast.
- Coating and heat-treating equipment: isolation points on vacuum coaters and furnaces, and on their leak-testing and gas-analysis lines.
- “Dirty” process lines: CVD / PVD chambers, scrubbers and particulate traps, where a PTFE-seated ball valve tolerates deposits better than a bellows-sealed valve because the seats wipe the ball each time it turns.
- Helium leak-detection setups: the on/off valve between a calibrated leak or test piece and the detector, on KF flanges that connect and disconnect by hand.
- Gauge isolation and gas inlet / vent points: blocking a gauge so it can be fitted or removed, or admitting and venting gas on laboratory systems; the locking plate on the lever guards against accidental operation.
- Chambers that get disconnected and moved: for example glovebox-integrated coating systems, where a valve at each end lets the chamber be closed off, unclamped and carried across under vacuum.
- Points that will be automated later: the V-3AM’s ISO 5211 pad takes a pneumatic or electric actuator when the line moves to PLC control; a quarter-turn on/off valve is the natural fit for that.
Related: for a pneumatic version of this valve see the vacuum rated ball valve, pneumatic (KF & ISO-K); for switching between two vacuum lines see the 3-way vacuum ball valve, manual or pneumatic (KF NW40 / NW50). For the larger ISO-K sizes in a hand-operated two-piece body see the vacuum isolation valve, ISO-K DN80/DN100. KF/NW centering rings are stocked to match. Browse all valvole per il vuoto.
Domande frequenti
What is the difference between KF (NW) and ISO-K flanges?
Both are clamp-style vacuum flanges. KF (also written NW or QF) covers the small sizes — NW16 to NW50 on this valve — sealed with a centering ring and clamped by hand. ISO-K is the larger series; the 2-1/2″ size here uses ISO80. Match the flange to the fittings your system already uses.
Manual or direct-mount — which should I choose?
Choose the V-3A lever version for hand-operated isolation points. Choose the V-3AM if the valve is — or may later be — automated: its ISO 5211 pad takes a pneumatic or electric actuator directly, with no bracket to fabricate. The V-3AM ships with a lever too, so it works by hand until the actuator goes on.
È a passaggio totale?
Yes. The bore is unrestricted through the valve, so in the open position the valve does not reduce the conductance of the line it sits in. Bore diameters for each size are on the dimension sheet PDF above.
Can the valve be serviced?
Yes. The three-piece body unbolts while the end caps stay clamped in the line, so the seats and ball can be inspected, cleaned or replaced without cutting the valve out.
Quali guarnizioni vengono utilizzate?
PTFE seat, gaskets and packing on both builds; the V-3AM adds a Viton O-ring on the stem for a reinforced seal under vacuum.
È prevista una quantità minima d'ordine?
No. Non abbiamo un quantitativo minimo d'ordine. Dicci di cosa hai bisogno e ti faremo un preventivo.
What is the operating temperature range?
Valve body −20 °C to +180 °C, set by the PTFE seats.
Is it available in 304 stainless?
316 (cast CF8M) is standard. 304 (cast CF8) is made to order — tell us the size, flange and quantity when you request a quote.
Politica di esempio
Siamo lieti di fornire ai clienti campioni di prodotto per valutare la qualità o effettuare test. Il processo inizia in genere con un preventivo basato sulle specifiche del cliente.
Se il prezzo è accettabile, possiamo offrire campioni gratuiti o a pagamento, a seconda del tipo di prodotto e della disponibilità.
Le spese di spedizione sono a carico del cliente.
Processo d'ordine
Dopo aver confermato i requisiti del prodotto e altri dettagli con il cliente, emetteremo una conferma di vendita per approvazione. Una volta confermata, il cliente è tenuto a versare un deposito 30% per procedere con la produzione.
Quando la produzione di massa è completata e la merce supera l'ispezione, il cliente deve pagare il saldo 70% prima di organizzare la spedizione.
Prodotti correlati
Domande frequenti
A. Come posso richiedere un preventivo?
Si prega di fornire una scheda di richiesta dettagliata che includa le specifiche del prodotto, i materiali, le quantità ed eventuali requisiti speciali. Vi offriremo un'offerta basata sulla vostra richiesta.
B. Quali sono i termini di quotazione?
I nostri preventivi si basano in genere su Condizioni FOB. Tuttavia, possiamo anche offrire CFR, CIFo altri Incoterms su richiesta.
C. Qual è la vostra quantità minima d'ordine (MOQ)?
MOQ depends on the product. We operate on a made-to-order basis, and trial orders are welcome. For smaller orders, freight is arranged and borne by the buyer.
D. Quali sono i termini di pagamento?
Per T/T - 30% acconto sulla conferma d'ordine e 70% saldo prima della spedizione.
E. Qual è il vostro tempo di consegna?
I tempi di consegna dipendono dalla quantità ordinata e dalle specifiche. Vi confermeremo i tempi esatti quando Richiedi un preventivo.
Volete saperne di più?
Se siete interessati a uno dei nostri prodotti o servizi, compilate il modulo sottostante. Il nostro team si metterà in contatto con voi il prima possibile per fornirvi le informazioni di cui avete bisogno.




