Nome del prodotto

Valvola a sfera a saldare — Estremità allungate, a 3 pezzi, 316, 1000 WOG, a passaggio totale

SKU: V-3A-L2
COD V-3A-L2 Categoria Marchio:

Riepilogo del prodotto

Butt weld ball valve with extended weld ends. The extra length keeps welding heat away from the PTFE seats — so you weld it in fully assembled, and the seals survive.

Three-piece body: after it is welded in, you can still open it and replace the seats. The ends stay in the line. Nothing gets cut out.

316 stainless · 1000 WOG · full port · 3/8″ – 4″ · lockable lever

Before you order: the weld ends are JIS pipe, Schedule 5S only. They will not mate cleanly with Sch 40 or heavier pipe. Send us your pipe spec and we will confirm it fits — that email is cheaper than a valve you cannot use.

Prodotto a Taiwan. Nessun quantitativo minimo d'ordine. Full 17-part material list and the pipe OD / wall thickness table are below.

Richiedi un preventivo — risposta entro 24 ore →

Descrizione del prodotto

A valvola a sfera con giunzione a saldare in 316 stainless steel, three-piece body, 1000 WOG, full port, 3/8″ to 4″. The weld ends are extended — noticeably longer than a standard butt weld end — and that is the entire point of this valve.

Read the two sections below before you order. One tells you why the ends are long. The other tells you what pipe this valve fits, and what pipe it does not.

Why the Weld Ends Are Long

A ball valve seals on PTFE. PTFE begins to degrade well below the temperature of a weld pool.

On a standard butt weld valve, the weld sits close to the body — and the heat travels down the metal into the seats. That is why people weld a valve in, pressure-test the line, and find the valve leaking. The seals were cooked during installation, before the valve ever saw a drop of product.

The extended ends move the weld away from the seats. The extra length is the heat sink. You weld the valve in fully assembled — no dismantling, no removing the ball and seats, no reassembling it in a trench.

And because the body is three-piece, you can still take it apart afterwards: undo the body bolts, lift the centre section out, replace the seats, put it back. The ends stay welded in the line. Nothing gets cut out.

What Pipe Does It Fit? (Read This)

We would rather lose the order than have you weld this valve into the wrong pipe.

  Questa valvola
Pipe standard JIS pipe dimensions
Wall thickness Schedule 5S only. We do not make it in other schedules.
It fits JIS Sch 5S thin-wall stainless pipe
It does not fit Schedule 40 or heavier pipe, without machining a transition. The wall thickness will not match and the bore will step at the weld.

← Scorri la tabella per visualizzare tutte le colonne →

If you are running Schedule 40 pipe, this is the wrong valve and we will tell you so. Send us the pipe spec — standard, size and schedule — before you order, and we will confirm whether this valve mates with it. That one email is cheaper than a valve you cannot use.

Dimensioni

Extended butt weld ball valve dimension drawing showing L, H, D1, bore, pipe OD and wall thickness - YZNG TRONG
The letters match the columns in the table below. Numbers ①–⑰ match the material list further down. Unit: mm.
Dimensione Ø d
bore
L
face to face
H
height
T
wall thk
Ø D
pipe O.D.
D1
lever
3/8″ 12.5 160 57.2 1.2 17.2 105
1/2″ 15.0 180 59.1 1.65 21.7 105
3/4″ 20.0 180 62.55 1.65 27.2 105
1″ 25.0 192 70.7 1.65 34.0 128
1-1/4″ 32.0 205 76.2 1.65 42.7 128
1-1/2″ 40.0 230 89.1 1.65 48.7 154
2″ 50.0 243 98.15 1.65 60.5 194
2-1/2″ 65.0 294 110.6 2.1 76.1 194
3″ 80.0 320 124.0 2.1 89.0 276
4″ 100.0 357 168.5 2.1 114.3 335

← Scorri la tabella per visualizzare tutte le colonne →

ØD is the pipe outside diameter. T is the wall thickness. Those are the two numbers a welder actually needs, and most valve makers do not publish them. Check them against your pipe before you order.

Cosa contiene — Elenco completo dei materiali

All seventeen parts, and what each one is made of.

No. Parte Materiale
1 Corpo ASTM A351 Gr. CF8M (316)
2 Tappo ASTM A351 Gr. CF8M (316)
3 Palla ASTM A351 Gr. CF8M (316)
4 End seals PTFE
5 Bolts ASTM A193 Gr. B8
6 Guarnizione PTFE
7 Rondella di spinta PTFE
8 Stelo ASTM A276 Gr. 316
9 Imballaggio PTFE
10 Ghiandola SS304
11 Bevel washer SS304
12 Rondella elastica SS304
13 Piastra di bloccaggio SS304
14 Manico SS304
15 Manicotto di protezione Impugnatura in vinile
16 Bolt washer SS304
17 Bolt nuts ASTM A194 Gr. 8

← Scorri la tabella per visualizzare tutte le colonne →

Specifiche tecniche

Articolo Specifiche tecniche
Tipo di valvola Three-piece ball valve, extended butt weld ends
Pressione nominale 1000 WOG
Corpo, cappuccio e pallina Acciaio inossidabile 316 (ASTM A351 CF8M)
Stelo ASTM A276 Gr. 316
Sedili e guarnizioni PTFE
Porto Porta completa
Gamma di taglie 3/8″ – 4″
Pipe standard JIS
Wall thickness Schedule 5S (we do not make other schedules)
Funzionamento Manual lever, lockable
Paese di origine Prodotto a Taiwan

Not Sure Butt Weld Is What You Want?

Welding a valve into a line is permanent. If you would rather be able to unscrew it, or if your pipe is not JIS Sch 5S, look at these instead:

Al posto giusto

  • Welded stainless lines that still need servicing — the three-piece body opens in place, so the seats can be replaced without cutting the valve out.
  • JIS Sch 5S thin-wall piping — water, oil, gas, process lines up to 1000 WOG.
  • Installations where a threaded joint is not acceptable — no thread, no sealant, no leak path.

Acquistare da noi

  • Non è previsto un quantitativo minimo d'ordine.
  • Produttore, non società commerciale. Il nostro stabilimento a Taiwan, valvole in acciaio inossidabile dal 1999.
  • Certificato di macinazione su richiesta.
  • Tempi di risposta per i preventivi: entro 24 ore.

Richiedi un preventivo — risposta entro 24 ore →

Send us your pipe spec — standard, size and schedule — and we will confirm the valve mates with it before you commit.

Domande frequenti

Perché le estremità delle saldature sono prolungate?

Per tenere il calore della saldatura lontano dalle sedi in PTFE. In una valvola standard con saldatura di testa, la saldatura si trova a stretto contatto con il corpo e il calore si propaga lungo il metallo fino alle sedi; ecco perché una valvola può superare l’ispezione, essere saldata in posizione e poi presentare perdite durante la prova di pressione. La lunghezza aggiuntiva funge da dissipatore di calore, consentendo di saldare la valvola completamente assemblata senza smontarla.

Su quale tubo si monta questa valvola?

JIS pipe dimensions, Schedule 5S wall thickness only. It will not mate cleanly with Schedule 40 or heavier pipe without machining a transition — the wall thickness does not match and the bore will step at the weld. Send us your pipe standard, size and schedule and we will confirm before you order.

Realizzate anche altri programmi?

No. Solo programma 5S.

È possibile effettuare la manutenzione della valvola dopo che è stata saldata?

Sì, è proprio questo il motivo per cui il corpo è composto da tre parti. Basta svitare i bulloni del corpo e sollevare la sezione centrale per sostituire i sedili. Le estremità saldate rimangono al loro posto. Non occorre tagliare nulla.

Devo smontare la valvola prima di saldare?

No. Le estremità allungate servono proprio a evitare che tu debba farlo. Saldalo una volta assemblato.

Quali taglie producete?

3/8″ to 4″. Ten sizes, all in the dimension table on this page, including pipe outside diameter and wall thickness.

Qual è la pressione nominale?

1000 WOG.

È a passaggio totale?

Yes.

Can I get it with an actuator?

Yes — the pneumatic version is the same extended butt weld body with an air actuator fitted.

È previsto un quantitativo minimo d'ordine?

No. Dicci di cosa hai bisogno e ti faremo un preventivo.

Politica di esempio

Siamo lieti di fornire ai clienti campioni di prodotto per valutare la qualità o effettuare test. Il processo inizia in genere con un preventivo basato sulle specifiche del cliente.

Se il prezzo è accettabile, possiamo offrire campioni gratuiti o a pagamento, a seconda del tipo di prodotto e della disponibilità.
Le spese di spedizione sono a carico del cliente.

Processo d'ordine

Dopo aver confermato i requisiti del prodotto e altri dettagli con il cliente, emetteremo una conferma di vendita per approvazione. Una volta confermata, il cliente è tenuto a versare un deposito 30% per procedere con la produzione.

Quando la produzione di massa è completata e la merce supera l'ispezione, il cliente deve pagare il saldo 70% prima di organizzare la spedizione.

Domande frequenti

Si prega di fornire una scheda di richiesta dettagliata che includa le specifiche del prodotto, i materiali, le quantità ed eventuali requisiti speciali. Vi offriremo un'offerta basata sulla vostra richiesta.

I nostri preventivi si basano in genere su Condizioni FOB. Tuttavia, possiamo anche offrire CFR, CIFo altri Incoterms su richiesta.

Non abbiamo un MOQ. Lavoriamo su ordinazione e accettiamo ordini di qualsiasi dimensione. benvenuto. Per gli ordini più piccoli, il trasporto è organizzato e a carico dell'acquirente.

Per T/T - 30% acconto sulla conferma d'ordine e 70% saldo prima della spedizione.

I tempi di consegna dipendono dalla quantità ordinata e dalle specifiche. Vi confermeremo i tempi esatti quando Richiedi un preventivo.

Volete saperne di più?

Se siete interessati a uno dei nostri prodotti o servizi, compilate il modulo sottostante. Il nostro team si metterà in contatto con voi il prima possibile per fornirvi le informazioni di cui avete bisogno.

Torna in alto